The inside work of finishing the stairs, electrical wiring,
plumbing, security system, fire place, satellite system, and heating system, was
started in December. The cabin was now closed in with an insulated lid and
the metal roof was complete. Matt and Alan put in the wood stove
that Forest gave to us as construction heat. It was needed because the
weather turned very cold and wet. It was close to 16 below zero for a week before a
warm spell dumped snow and rain the entire week between Christmas and New
Years. |