Closed In

Back to Project History 2005

The two weeks before Thanksgiving, the weather was beautiful.  It gave Matt and I a chance to finish the metal roofing, metal trim, and the cedar fascia.  We finished both sides of the roof the Tuesday before Thanksgiving.

 

 

 

Back to top