Matt and Perry started
framing the walls on July 19, 2005. Each of the outside four walls
were built and lifted into place one at a time with wall jacks.
Alan gave us a hand with the heavy south wall. Sid, Joyce,
and Kodi helped on the weekend, and by July 27th, all the outside
and inside walls were framed and in place. |